17–19 March 2027 · IMPACT

ASEAN Clean Energy & HVAC Week 2027 Stand Construction | Bangkok

This is the one show in the list held at IMPACT, and it is built around plant: condensers, air handlers, chillers and cleanroom modules. Many exhibitors want a running unit on the stand, which turns the build into a services and structure problem.

Quote for this show

Tell us the stand size and equipment. Drawings can follow by email.

01Show facts
Dates
17–19 March 2027
Venue
IMPACT Exhibition Centre, Muang Thong Thani, 99 Popular Road, Banmai, Pakkred, Nonthaburi 11120
Halls
Hall allocation per the organiser's floor plan. Confirm with organiser.
Organiser
Compass Exhibition Co., Ltd., with Guangdong Grandeur International Exhibition Group as co-organiser
Exhibitor profile
Refrigeration, heating, ventilation, air conditioning and cleanroom suppliers, with co-located smart energy, storage and wind exhibitors.
02Technical build requirements

What the structure has to carry at ASEAN Clean Energy & HVAC Week

Plant and chiller mass

A cut-away chiller or condenser unit is heavy and tall. The permitted floor loading for the IMPACT hall is not stated here; confirm with organiser — we handle this for you, then we plan a plated base for the plant.

Confirm with organiser — we handle this for you

Large-item entry through the hall doors

Tall units need a clear path from the loading area to the stand. We build the stand wall as a late-closing panel and agree the delivery route and forklift or crane support with the organiser's handler.

Confirm with organiser — we handle this for you

Running a unit on the stand

A live air-conditioner or heat pump needs power, and sometimes a condensate drain or a cooling loop. We provide a containment tray and route the drain to the permitted point, with the supply ordered through the organiser.

Confirm with organiser — we handle this for you

Cleanroom and enclosure builds

Clean-air exhibitors often want a walled mini-room. We frame it as a self-supporting enclosure with a defined ceiling, then check the fire and ventilation rules with the organiser before we fix a lid.

Confirm with organiser — we handle this for you

Roofed and two-level stands

Covered or double-deck stands need a PE-stamped submission with a stability statement. Rigging limits and hall height: confirm with organiser — we handle this for you.

Confirm with organiser — we handle this for you

03Typical stand sizes and budget bands

Inline

36 sqm

One powered unit on a display base

Essential
THB 252,000 – 324,000
USD 7,750 – 9,970
Standard
THB 360,000 – 504,000
USD 11,080 – 15,510
Premium
THB 576,000 – 864,000
USD 17,720 – 26,580

Island

72 sqm

Plant zone with drip containment and a cleanroom enclosure

Essential
THB 504,000 – 648,000
USD 15,510 – 19,940
Standard
THB 720,000 – 1,008,000
USD 22,150 – 31,020
Premium
THB 1,152,000 – 1,728,000
USD 35,450 – 53,170

Large island

90 sqm

Several running units, with a meeting level as an optional extra

Essential
THB 630,000 – 810,000
USD 19,380 – 24,920
Standard
THB 900,000 – 1,260,000
USD 27,690 – 38,770
Premium
THB 1,440,000 – 2,160,000
USD 44,310 – 66,460

Planning ranges per sqm: Essential THB 7,000–9,000 · Standard THB 10,000–14,000 · Premium THB 16,000–24,000. USD at THB 32.5 = USD 1. Double-deck structures, machinery platforms and rigging are quoted on top of these ranges. Pixelmate Exhibition Co., Ltd. confirms the figure after reviewing your drawings.

04What Pixelmate built here

No published project photograph from this show yet. We treat plant-heavy stands as a services plan first: the unit, its power and its drain are placed on the drawings before any wall is drawn.

Pixelmate show guides on pixelmateexpo.com
05Technical FAQ
Can we run a refrigeration or heat-pump unit during the show?

Often yes, subject to the organiser's electrical and safety rules. We plan the supply, the drain and a spill tray, and confirm what the manual allows.

What about a unit that is taller than the stand wall?

We design a cut-out or a raised feature that shows the unit without tying the wall to its height. Hall height and any hanging restriction are confirmed with the organiser.

Is a cleanroom module a structure that needs approval?

A self-supporting enclosure with a roof can be treated as a covered structure. We prepare the drawings and submit them if the organiser requires it.

How is exhaust or heat from demo units handled?

We locate units so heat and noise leave toward the stand interior or a service corner, not onto neighbours. The organiser's manual sets limits that we check.

Does IMPACT require a different approach to move-in?

Access routes, dock arrangements and contractor registration differ per venue. We confirm the specifics for IMPACT with the organiser for each build.

Send your drawings for ASEAN Clean Energy & HVAC Week

Pixelmate Exhibition Co., Ltd. reviews the equipment, hall and approval route, then returns a technical estimate.

Upload drawings

Cookies

We use essential storage to run this site and, with your consent, anonymous analytics to improve it. Your enquiry details are only used to respond to your project.